Define the essentials before choosing hardware
Begin with a list of equipment you want to keep running when the grid fails. Separate essentials, such as a small set of lights and communications equipment, from large or discretionary loads. For each item, tell the installer when it is used and whether it must run at the same time as other equipment. Do not assume that an appliance drawing little energy over a day has a low starting demand.
Ask for an installed-system proposal that answers the practical question: which circuits will receive power during an outage? A product feature describing backup operation does not show how your building has been wired. Solis hybrid manuals have distinct grid, backup and installation requirements that must be applied to the exact model.
Sources: S6-EH1P 3-8kW PLUS user manual
Capacity, power and reserve answer different questions
When comparing quotations, ask for three separate explanations. First, what energy is available for the selected loads? Second, what output can the installed system provide at one time? Third, what operating reserve will be retained before an unexpected outage? These are planning questions for the installer; changing settings without the design context can produce a result very different from the one you expected.
Request a realistic scenario using your own essential-load list. For example, ask how the system would behave after an evening of normal use, followed by an outage before sunrise. A best-case demonstration with a full battery is useful, but it is not the same as that everyday scenario. Ask which assumptions could shorten the expected operating time.
Sources: S6-EH1P PLUS 21A user manual
Three-phase backup needs a phase-by-phase explanation
For a three-phase building, ask the installer to explain how selected loads are distributed. A total inverter rating is not a promise that the entire amount is available to any one circuit. The relevant Solis documentation distinguishes operating modes and phase-related limits. Your equipment schedule should identify the exact three-phase model, battery arrangement and backup design rather than relying on a general family description.
If a heat pump, pump, workshop machine or other substantial load matters, name it specifically in the brief. Ask for a written answer about normal demand, starting demand and simultaneous operation. A list of supported product features is not a substitute for checking those loads against the complete system.
Sources: S6-EH3P 5-12kW HV hybrid user manual, S6-EH3P 12-20kW hybrid user manual
Ask for a demonstration and an owner instruction sheet
At handover, ask the installer to demonstrate the intended outage behaviour safely. Request a written list of supplied circuits, excluded circuits, expected limitations and the owner actions that are appropriate. Keep the installer contact, product manuals and relevant monitoring details together. Other members of the household or staff should be able to find the instructions without needing access to an installer account.
Do not perform an improvised outage test by disconnecting equipment, altering changeover arrangements or opening electrical enclosures. If the installed behaviour differs from the agreed design, record what happened and contact the installer. Before buying equipment through SolarBoss, use the same questions to make sure that backup requirements form part of the proposal rather than an assumption added after ordering.
Sources: S6-EH3P 15-20kW Ireland datasheet
Customer guidance, not installation instructions. Your qualified installer must confirm the exact equipment, protection, grid connection and commissioning requirements.
Sources and review
Manufacturer facts are attributed above. The comparison questions and checklists are original editorial guidance from this independent SolarBoss resource.
- S6-EH1P 3-8kW PLUS user manual (checked 2026-11-09)
- S6-EH1P PLUS 21A user manual (checked 2026-11-09)
- S6-EH3P 5-12kW HV hybrid user manual (checked 2026-11-09)
- S6-EH3P 12-20kW hybrid user manual (checked 2026-11-09)
- S6-EH3P 15-20kW Ireland datasheet (checked 2026-11-09)