Agree what will be installed before work begins
Ask for an equipment schedule naming the inverter, battery if included, monitoring device and any planned backup equipment. Keep the manufacturer identifiers rather than only a short sales description. If the proposal changes, request an updated schedule before substitution. That makes it easier to check documents, understand the final system and order an appropriate replacement later.
Discuss the building’s electricity supply and planned future loads with the installer. An electric vehicle, heat pump or workshop addition can affect the design brief. These details should be considered with the installation rather than used to select an inverter from a headline rating alone. Ask the installer to explain unresolved assumptions and record the decisions that matter to you.
Sources: Solis Ireland inverter range
Ask which connection route and evidence apply
The network connection process depends on the complete project. ESB Networks publishes separate information for microgeneration and mini-generation. Ask your installer which route applies and what notifications, applications, certificates or permissions are required. A document downloaded from a manufacturer page is supporting evidence, not proof that your particular installation has completed its connection process.
Keep the relevant submission or acceptance records in the handover pack. The manufacturer’s Ireland pages include ELS declarations for specific families, but those should be matched to the actual equipment and application. Do not assume that a similar family name covers every variant. If you are unsure what a declaration establishes, ask the installer to explain it in the context of the project.
Sources: ESB Networks microgeneration connection policy, ESB Networks mini-generation connection policy, S6-EH3P 5-12kW ELS NC7 declaration, S6-EH3P 12-20kW ELS declaration
Check the owner experience while the installer is present
Ask for a demonstration of normal monitoring and a clear explanation of the main readings you will use. Confirm the correct plant, owner email and support contact. Make sure you know where the manuals and installation records are stored. If the app display looks unexpected, resolve the question while the installer can compare it with the actual system.
If backup is included, request a safe demonstration and a written list of the circuits covered. Ask which loads must remain off and what to expect when the battery reserve is low. A short owner instruction sheet is more useful in an outage than having to search a long installation manual for the first time. Keep routine operation separate from installer-only controls.
Sources: SolisCloud owner manual landing page, S6-EH3P 5-12kW HV hybrid user manual
Finish with an organised pack and a support route
The pack should bring together the final equipment schedule, invoices, commissioning record, applicable manuals, compatibility evidence and the network-related documents for the project. Add the installer’s contact details and an agreed route for reporting problems. If an item is outstanding, write down who is supplying it and when rather than treating the handover as complete by assumption.
You can then use the hub as a reference index for later questions, with the manufacturer source available beside each relevant document. Before a future battery expansion or inverter change, give the new installer the existing pack. SolarBoss can assist with product identification and purchasing enquiries, while the qualified installer confirms the electrical design, site suitability and current connection requirements.
Sources: ESB Networks retrospective registration guidance, Solis global battery matching list
Customer guidance, not installation instructions. Your qualified installer must confirm the exact equipment, protection, grid connection and commissioning requirements.
Sources and review
Manufacturer facts are attributed above. The comparison questions and checklists are original editorial guidance from this independent SolarBoss resource.
- Solis Ireland inverter range (checked 2026-11-09)
- SolisCloud owner manual landing page (checked 2026-11-09)
- ESB Networks retrospective registration guidance (checked 2026-11-09)
- ESB Networks microgeneration connection policy (checked 2026-11-09)
- ESB Networks mini-generation connection policy (checked 2026-11-09)
- Solis global battery matching list (checked 2026-11-09)
- S6-EH3P 5-12kW HV hybrid user manual (checked 2026-11-09)
- S6-EH3P 5-12kW ELS NC7 declaration (checked 2026-11-09)
- S6-EH3P 12-20kW ELS declaration (checked 2026-11-09)